Newsletter
Contact us
WAY TO SUCCESS
WAY TO SUCCESS

CONSTRUCTION OF DENSE BITUMINOUS MACADAM ROAD

Step 1: Preparation of sub base and base by using GSB WMM in top base layer
Step 2 : Application of Tack Coat : The bitumen binder is heated up to required temperature and a tack coat is applied to the surface.
Step 3: Preparation and placing of Premix ( Bitumen Macadam )
Step 4: Rolling A mix after it is placed on the base is thoroughly compacted by rolling by 8 to 12 tones.

Start typing and press Enter to search